Exceptional Opportunity to Create Your Dream Home in Marbella

2.150.000 €

This stunning villa opportunity is set within one of Marbella East’s most prestigious gated communities, offering the perfect canvas to create your dream home. The location combines privacy, security, and convenience, with newly built roads, lush green surroundings, and easy access to everything Marbella is known for. Long stretches of Mediterranean beaches, exclusive beach clubs, renowned restaurants, shopping areas, and the Royal Tennis Club are all just minutes away.

Designed by one of Marbella’s most celebrated architects, the villa embraces modern Mediterranean living with a focus on space, light, and spectacular views. From the rooftop solarium terraces, you can enjoy panoramic vistas of the iconic La Concha mountain and the shimmering Mediterranean Sea, creating the perfect backdrop for relaxation or entertaining.

The property sits on a generous 1,000 m² plot and offers 560 m² of built space across the basement and main living levels, complemented by 351 m² of terraces and rooftop areas. It is sold with a building licence already in place, allowing construction to commence immediately, with the option to include a completed main structure at an additional cost.

This is a rare chance to own and build a contemporary villa in a sought-after Marbella address, combining elegance, stunning views, and close proximity to the coast.

NOTE: The advertised price is for the plot and the provided renders are intended as conceptual inspiration for the final construction. ; construction costs are additional.

Similar properties

Semi detached villa situated in Vasari resort
Puerto Banus, Marbella (All)

Semi detached villa situated in Vasari resort

2.575.000 € with 5 bedrooms

A brand new south west facing villa in La Alqueria.

2.550.000 € with 5 bedrooms

Exquisite Villa Redesigned to Embrace Serene Surroundings

2.525.000 € with 5 bedrooms

Exquisite Four-Bedroom Luxury Villa in La Finca de Marbella, Marbella East

2.500.000 € with 4 bedrooms